Feasibility read within 2 working hours — if it will not work, we say so

Leave your contact
How scoring works: one answer per question, pick what matches reality. Total 0–20; lower means more ready. The verdict is rule-based and does not replace a site survey.

Start the check

Ten questions, about two minutes. Nothing to prepare — answer by what you know today.

  1. 01Can you confirm the exact brand and model of the machine?

  2. 02Does the machine expose a usable development interface (SDK / API)?

  3. 03Does it support standard industrial protocols (Modbus / EtherNet IP / OPC UA)?

  4. 04Must the retrofit connect to PLC / MES / AGV systems?

  5. 05Does the retrofit touch safety circuits (safety PLC, light curtain, E-stop chain)?

  6. 06Is the machine still under OEM warranty?

  7. 07Can the line take a continuous production stop?

  8. 08Can you provide part drawings, cycle-time baseline and yield data?

  9. 09Can the goal be stated in one measurable sentence?

  10. 10Which budget band applies?

Answered 0 / 10

The verdict comes from scoring rules to show direction only; not a technical conclusion.

Skip the questions? Send the model and your goal instead — within 2 working hours we reply whether it is feasible, roughly what it costs, and how long it takes.

Three verdicts and what followed

Verdict: do not retrofit yet

Stamping shop (anon.)

Incoming parts varied too much; automation would amplify defects. Fixtures and incoming control first, review in three months.

Fix process first

Verdict: single station viable

Moulding plant (anon.)

Stable cycle and fixed path at the take-out station; retrofitted in four weeks, other stations left manual.

Live in 4 weeks

Verdict: assess the whole line

Assembly line (anon.)

Six dependent stations, no gain from a single station; released in two waves while running.

Waves in parallel

Send us your result

Tap "Send answers to an engineer" above — answers fill the message box; add a contact.