Feasibility read within 2 working hours — if it will not work, we say so

Leave your contact

Parts catalogue

From joints to compute boards, roughly 80% of a robot can be sourced inside Shenzhen. Our list follows the BOM layers so you fill exactly the gap you have.

  • 01

    Joint modules

    Harmonic or planetary reducers integrated with motors, hollow routing and brake options.

  • 02

    Frameless torque motors

    Joint-specific frameless motors with high torque density, custom OD and stack height.

  • 03

    Coreless & micro motors

    Coreless, stepper and BLDC motors for dexterous hands, end effectors and gimbals.

  • 04

    Servo drives

    Integrated servos with EtherCAT or CANopen, torque and position hybrid modes.

  • 05

    Encoders & sensors

    Magnetic and optical encoders, 6-axis force sensors, joint torque and IMUs with calibration.

  • 06

    Hands & end effectors

    Multi-finger hands, two-finger grippers, vacuum and magnetic tools with tactile options.

  • 07

    Screws & transmission

    Planetary roller screws, linear actuators, belts and precision gears for humanoid legs.

  • 08

    Controllers & compute

    ARM/x86 controllers, edge compute modules, real-time control and IO expansion boards.

  • 09

    PCB & assembly

    Multilayer, HDI and rigid-flex prototypes plus small-batch SMT with impedance and test reports.

  • 10

    Structures & harnesses

    CNC aluminium, sheet metal, carbon fibre, injection parts and custom cable assemblies.

Why Huaqiangbei is stop one for robot teams

In the US a control-board respin often waits two weeks for a fab slot plus a week of air freight. In Shenzhen an engineer edits the schematic in the morning, drops it at the fab after lunch, gets it assembled the next day and runs it in the machine the day after. The speed comes from density, not from being cheap.

  • Component market and distributors on the same block
  • PCB turns in days, expedited slots available
  • CNC and sheet-metal prototypes scheduled same day
  • Assembly houses absorb hundred-unit pilot runs
  • Engineers, toolmakers and process experts in one city
  • Low prototype cost means more versions tested
  • No gap between prototype and volume path
  • Mature global logistics and customs support
Why Huaqiangbei is stop one for robot teams

Prototype and iteration: two paths

Typical overseasShenzhen chain
PCB fab2–4 weeks incl. queue and freightDays with expedited slots
PCBA assembly1–2 weeks outsourced3–5 days small batch
Structural prototype3–6 weeks3–7 days CNC or sheet metal
Tooling & moulding8–12 weeks4–8 weeks rapid tool plus trials
One machine iteration3–6 monthsWeekly loops of 2–6 weeks
Part restock1–3 weeks internationalSame day to 3 days locally

BOM to delivery in five steps

  1. STEP 1

    BOM breakdown

    Layer by joint, control, structure and harness; flag long-lead and risky parts.

  2. STEP 2

    Prototype

    PCBs and structures kicked off in parallel; parts ready to build within a week.

  3. STEP 3

    Build & test

    Joint calibration, integration and burn-in; fixes made the same day.

  4. STEP 4

    Pilot run

    Ten to a hundred units, proving assembly, fixtures and test flows.

  5. STEP 5

    Volume & ship

    Alternates and safety stock locked, weekly scheduling, direct export.

Supply chain delivery scenarios

Humanoid joint assemblies

Humanoid team (anonymised)

Frameless motor, harmonic reducer and magnetic encoder as one joint, hollow routing and brake included.

Joint assembly

Three board iterations

Overseas robotics startup

Schematic change to assembled board in three days; three control variants proven in two weeks.

Weekly loops

Quadruped structures

Quadruped team

Aluminium and carbon fibre leg parts balanced for weight and stiffness by duty cycle.

Batch structures

Hands and end effectors

Research and education

Multi-finger hands and two-finger grippers with tactile and force-control options.

Custom end effector

Education robot kits

Edtech equipment firm

Complete kit parts, sorting, packaging and teaching manuals as one delivery.

Complete kits

Emergency part sourcing

European integrator (anonymised)

Pin-to-pin alternates validated and shipped the same day to keep the line running.

Emergency sourcing

PCB plus assembly

Service robot brand

Fab and placement back-to-back in one city, with impedance and first-article reports.

Board-level delivery

Harness routing rework

Cobot maker

Hollow-joint routing rearranged to stop fatigue failures at the bending point.

Routing reliability

Note: the cycle times on this page are industry experience ranges for estimating iteration pace and are not lead-time commitments. Actual lead time follows part number, quantity, process difficulty and current capacity. Cases describe client types with names anonymised.

Parts FAQ

What is the minimum order?
PCB prototypes from one piece; assembly starts at panel level; single CNC prototypes are fine; standard motors, drives and sensors follow factory packing or break-pack policy; custom joints and harnesses usually from ten units.
We only have drawings, no BOM — can you help?
Yes. Send schematics, structure drawings or photos of the sample and we return a suggested BOM with alternates before prototyping. Short items are flagged with risk levels.
Is a weekly board loop realistic?
Multilayer boards in days and structural prototypes in 3–7 days are routine, and a 2–6 week machine iteration is achievable — provided drawings are frozen and parts are complete. Constant redesign lengthens each loop.
Is there quality traceability?
Yes. Key parts carry per-batch inspection records, PCBs come with impedance and test reports, joint assemblies with calibration data; export customers can get conformity documents.
Can you localise parts to cut cost?
We propose pin-to-pin candidates per part number, validate in small batches (drift, life, accuracy), then switch and lock safety stock; if validation fails, the original part stays.
How do overseas customers receive goods?
Direct to your warehouse or a named address with customs and compliance documents; spares can be pre-positioned at local service points, returns follow the repair flow.

Send the BOM, get a weekly plan

Drawings, part numbers or prototype photos in; a fab-ready list, alternates and lead-time read out.

Talk to us