Feasibility read within 2 working hours — if it will not work, we say so

Leave your contact

Sourcing scope

From a whole machine to a single encoder: if brand and model are clear, it can be sourced. Research platforms, dev kits, refurbished units and spares use the same channel.

  • 01

    Industrial robots

    Six-axis, SCARA, cobots, delta and gantries with controller and teach pendant configuration aligned.

  • 02

    Mobile & humanoid

    AMRs, mobile manipulators, quadrupeds and humanoids, with dev kits and SDK licence checks.

  • 03

    Core components

    Servo motors, reducers, drives, encoders, force sensors and dedicated cabling.

  • 04

    End effectors & tooling

    Grippers, vacuum cups, quick changers, force-control flanges and vision modules with adapters.

  • 05

    Test & line equipment

    Shakers, inspection instruments, burn-in rigs and custom test fixtures sourced as a package.

  • 06

    Research & teaching units

    Lab platforms, dev boards and simulation licences, including education discount verification.

  • 07

    Used & refurbished

    Condition assessment, service-record checks, refurbishment validation and spares.

  • 08

    Spares & consumables

    Wear parts and consumables kept on a standing list, restocked quarterly or on demand.

Six sourcing steps

  1. STEP 1

    Clarify

    Workpiece, cycle, accuracy and budget written into one sheet.

  2. STEP 2

    Select & compare

    Multi-brand comparison with alternates and lifecycle assessment.

  3. STEP 3

    Commercial & compliance

    Price, lead time, origin and export-control screening confirmed together.

  4. STEP 4

    Cross-border logistics

    Booking, clearance, insurance and inland delivery, tracked by milestone.

  5. STEP 5

    Acceptance

    Unboxing, power-up, accuracy re-test and OEM document archiving.

  6. STEP 6

    Spares & service

    Standing spare list with agreed maintenance and repair paths.

Two lanes: import machines, export capability

Sourcing is usually read as one-way import: overseas brand, local install. There is a faster lane in real projects — bringing Chinese supply-chain parts and board capability to overseas teams.

Import: whole machines, controllers and special components from US, European and Japanese brands, with selection, clearance, acceptance and spares handled.

Export: humanoid joint modules, frameless torque motors, drives, 6-axis force sensors, dexterous hands, PCB fab and assembly, CNC and sheet-metal structures — supplied from Shenzhen straight to overseas robot teams.

The value is pace. Overseas teams often wait weeks or months for a revised board or a machined prototype; in Shenzhen the same loop runs in weeks. Nothing changes in the design — move the manufacturing step into the cluster and the development speed returns.

Whether you need imported equipment or Chinese parts and boards, it is the same conversation.

Why robotics teams fly to Shenzhen

Not to buy machines — to put R&D inside a cluster: revise in the morning, send boards after lunch, place parts next day, test the day after. Speed comes from density.

  • 01

    Boards in weeks

    PCB prototypes ship in days with rush slots; one full iteration is often 2–6 weeks.

  • 02

    Parts within an hour

    Motors, gearboxes, drives, connectors and structures in one city; same-day replenishment.

  • 03

    Humanoid joints local

    Frameless torque motors, harmonic joints, 6-axis force sensors and hands from source.

  • 04

    Same-day prototypes

    CNC and sheet-metal parts scheduled the same day, so revisions are not queued.

  • 05

    Small lots accepted

    SMT and pilot lines take ten to a hundred units before you commit to volume.

  • 06

    Engineers on site

    Structural, electrical, tooling and process people work within the same district.

  • 07

    Looser cost curve

    Low prototype and small-lot pricing means more design cycles on the same budget.

  • 08

    Prototype to volume

    The same suppliers carry you into volume; no re-qualification when you scale.

  • 09

    Export ready

    Customs, compliance documents and direct overseas shipping are routine here.

  • 10

    Your design stays yours

    Built to your schematic and BOM, no platform lock-in, IP stays with the team.

One revision cycle, two paths

Typical overseasShenzhen chainWhy
PCB prototype2–4 weeks (queue + freight)days with rush slotsFab density and re-flow
SMT build1–2 weeks outsourced3–5 days small lotNearby SMT and pilot lines
Machined parts3–6 weeks3–7 daysCNC and sheet metal in city
Joints and motorsCatalogue lead timesDirect from sourceConcentrated humanoid supply
Shortage refill1–3 weeks importSame day to 3 daysMarket and distributors co-located
One full iteration3–6 monthsoften 2–6 weeksAll steps within an hour
Design cycles1–2 per budget3–5 per budgetPrototype price and low MOQ

Source it yourself or through us

Do it yourselfThrough WTTJQR
Spec riskCatalogue picks; rework when the process does not fitModel derived from workpiece and cycle with alternates
Price & lead timeSingle quote with little leverageMulti-brand comparison with milestone dates
ComplianceExport control and origin easily missedScreened per order with complete documents
Clearance & freightSelf-sourced forwarder with no fallbackBooking and clearance and insurance handled together
Power-up on arrivalDelivery is the end; commissioning sourced separatelyUnboxing and power-up and accuracy re-test before handover
Spares laterFind out when it breaksStanding list and repair path agreed upfront

Compliance first: export control and origin

In robotics it is common to pick the right model and still stall on export control, certificates of origin or software licensing. We screen before quoting: whether export is lawful, whether a licence is needed, whether software and SDK rights transfer with the machine — then price and lead time.

  • Per-order screening against control lists and end-user statements
  • Origin and tariff classification confirmed upfront
  • Software and SDK licence scope written into the order
  • Dual sourcing on critical parts to avoid single-source deadlock
  • Full document archive for audit
  • Re-export scenarios assessed before commitment
Compliance first: export control and origin

Sourcing delivery scenarios

Cobot line sourced as a package

Auto parts maker (anonymised)

Selected to station cycle, controllers and end effectors configured together, commissioned on arrival.

Package sourcing

Research humanoid platform

University lab (anonymised)

Platform, SDK licence and spares landed together with teacher training.

Platform + licence

6-axis force sensors imported

Domestic robot team (anonymised)

Multi-brand price comparison and lead-time lock, alternates accuracy-tested first.

Price + alternates

Refurbished reducers in volume

System integrator (anonymised)

Condition and service records verified, refurbished units life-sampled before stocking.

Refurb validation

Reverse supply from China

Overseas robot team (anonymised)

Joint modules and PCBs shipped direct from Shenzhen, prototype loops running weekly.

Weekly loops

Spares channel build-out

Line user (anonymised)

Wear-part list and safety stock in place, so a missing part no longer stops the line.

Standing stock

Note: scope and process on this page describe the service. Brand authorisation, export-control conclusions and tariff classification follow the actual screening and official rulings for each order. Cases describe client types with names anonymised.

Sourcing FAQ

Are you an authorised distributor?
We do not claim agency status. We work as a procurement and integration partner: ordering through the OEM or authorised channels, or through a channel you designate, with authorisation status and warranty terms written into the contract.
How long does it take?
Stock models 4–8 weeks including freight and clearance; build-to-order 12–24 weeks; used and refurbished 3–6 weeks. Timing starts at contract and deposit, with logistics milestones tracked.
What is included in the price?
Equipment, international freight, clearance, insurance and on-site acceptance. Excluded: duty and VAT, site modification and commissioning hours, spares and extended warranty. Quotations are itemised for comparison.
Can you handle only clearance and delivery?
Yes. You place the order and we take freight, clearance, inspection and delivery; or only port collection and document handling.
What if export control blocks a model?
We give the conclusion first: lawful exports proceed; licences are supported; genuinely restricted items get alternate models or third-country routes assessed, with the legal boundary stated.
Can Chinese supply-chain parts ship together?
Yes. Joint modules, motors, sensors, PCBs and structures are consolidated in Shenzhen and shipped with imported equipment in one or several lots, with unified documentation.

Tell us brand and model

Send brand, model and application; we return a selection note, compliance read and delivery window.

Talk to us