Feasibility read within 2 working hours — if it will not work, we say so

Leave your contact

Retrofit layers

Low to high risk: tooling and programs first, then control and integration, then safety and compliance.

  • 01

    Layer 1: Process fit

    End effectors, fixtures, vision guidance and process parameters.

  • 02

    Layer 2: Programs

    Teaching rewrite, trajectory optimization, cycle and yield validation.

  • 03

    Layer 3: Integration

    PLC handshaking, MES/SCADA reporting, AGV coordination.

  • 04

    Layer 4: Safety

    Risk assessment, safety circuits, e-stop and guarding.

Retrofit scenarios

One method, many floor cases. Directions only; config follows a site survey.

🤸

PE demo robot

A robot does calisthenics on cue for PE class demos.

  • Routine library
  • voice cue
  • speed limit
Talk to us →
🔍

3C vision load

Camera-guided pick and place for mixed parts, results uploaded.

  • Hand-eye calibration
  • part switching
  • MES
Talk to us →
⚙️

Parts tending

Dual-station turnover loading, interlocked with machine door and chuck.

  • PLC handshake
  • collision interlock
  • cycle
Talk to us →
🔋

Module stacking

Heavy payload handling and precision stacking with force control.

  • Force assembly
  • vision offset
  • guarding
Talk to us →
📦

Box palletizing

Mixed carton palletizing with one-click recipe changeover.

  • Recipe changeover
  • cycle balance
  • washdown
Talk to us →
🔥

Welding retrofit

Seam tracking and pose re-planning to cut repeated teaching.

  • Laser tracking
  • pose optimization
  • spatter
Talk to us →
🎨

Painting fit

Gun flow coupled with travel speed for consistent film thickness.

  • Flow coupling
  • path planning
  • Ex-proof
Talk to us →
🛠️

CNC tending

Robot or gantry serving CNC machines for unattended night shifts.

  • Door interlock
  • part magazine
  • alarms
Talk to us →
🚚

Robot on AGV

Robot mounted on a mobile base for cross-station handling and lifts.

  • Navigation
  • dispatch
  • lift integration
Talk to us →
🧪

Lab sampling

Uncapping, pipetting and instrument loading in one automated flow.

  • Micro pipetting
  • barcode trace
  • data upload
Talk to us →
🏛️

Showroom guiding

Greeting, guiding and interactive demos with editable content.

  • Voice interaction
  • tour path
  • editable
Talk to us →
🌱

Agri picking

Ripeness detection and soft grippers that avoid bruising fruit.

  • Ripeness detection
  • soft gripper
  • sorting
Talk to us →

Example: a robot PE teacher

Target: one 45-minute PE class. A six-axis cobot in front of the mat runs eight routines on cue — full run or slow breakdown — called from a teacher tablet, with speed and force capped so students stay close.

  • Six-axis cobot, ~1.2m reach covers a standard mat
  • Eight routines × 8 beats, one-tap call on a tablet
  • Voice cue and beat synced with motion, slow mode
  • Suggested 250mm/s speed cap, 80N contact force limit
  • E-stop, soft limits and floor marking protection
  • Optional vision scoring of student pose accuracy
  • Motion library source files handed over
  • One teacher training session, two on-site co-runs
Example: a robot PE teacher
Note: Scenarios and parameters on this page are illustrative — they explain the retrofit approach, not signed customer cases. Actual cycle, payload and safety figures follow the site survey and acceptance.

Retrofit cases (anonymised)

Vision-located tending

Metal working (anon.)

Vision locating plus dual-station magazine; changeover from two hours to twenty minutes.

20-min changeover

Dispensing with bead check

Electronics (anon.)

Vision-guided path with in-line bead width measurement; out-of-tolerance parts diverted.

Full in-line check

Force-controlled deburring

Casting plant (anon.)

Constant-force floating tool with path compensation replacing manual deburring in a dust area.

Constant force

Dual-cobot assembly

Appliance line (anon.)

Two cobots split feeding and screwing; cycle rebalanced around the bottleneck.

Cycle rebalanced

Safety interlock upgrade

Auto parts (anon.)

Light curtains and speed limiting for shared cells, validated against safety functions.

Safety validated

Legacy controller swap

Packaging line (anon.)

Mechanics kept, controller replaced and programs rewritten so spares are available again.

Spares restored

Retrofit FAQ

Does retrofitting void the OEM warranty?
It depends on the OEM terms. We prefer external retrofits that leave the robot body and OEM safety circuits untouched (tooling, programs, host software, external PLC bypass). If body changes are unavoidable, we issue a change list for written confirmation with the OEM first.
How long does a retrofit take?
Light retrofit (end effector + program rebuild) is typically 2–4 weeks; standard retrofit with PLC/MES integration and on-site commissioning 6–10 weeks; vision guidance and line coordination 3–5 months. Timing starts once samples and the equipment model are available, excluding material lead time.
What is the budget range?
By depth: light 30k–150k CNY, standard 200k–450k CNY, vision or full-line 450k CNY and up; retrofit cost is usually 15%–25% of the robot price. These are industry reference ranges — the actual quote follows a site survey.
Can you retrofit without an OEM SDK or protocol docs?
Yes, over standard industrial interfaces: digital I/O, Modbus TCP, EtherNet/IP and OPC UA. If the controller is fully closed, we bypass it with an external PLC or protocol gateway, and replace the cabinet only if necessary. Feasibility is proven in the POC stage first.
Can you do software only?
Yes. Trajectory optimization, cycle-time reduction, yield improvement, vision algorithms, host software and reporting dashboards can all be delivered standalone — ideal when the equipment is new and mechanical changes are unwanted.
How long is the line stopped for commissioning?
Usually 3–7 days. We require over 80% of debugging to be finished in-house before going on site, prefer weekends or maintenance windows, and provide a day-by-day plan with a rollback option.

What we commit to

✓

No forced promises

If a case is not viable, we say so first, then talk scope and quote.

✓

OEM cert intact

Safety changes come with a risk assessment for you and the OEM to sign off.

✓

Clean handover

Commented programs, parameter lists, source files and backups stay with you.

✓

Staged acceptance

POC first, then line rollout; 10%–15% final payment tied to on-site acceptance.

Send your case first

Workpiece drawing, cycle requirement and current equipment model are enough.

Talk to us