Vision-located tending
Vision locating plus dual-station magazine; changeover from two hours to twenty minutes.
20-min changeover
The gap between a standard robot and a production machine — we close it.
Low to high risk: tooling and programs first, then control and integration, then safety and compliance.
End effectors, fixtures, vision guidance and process parameters.
Teaching rewrite, trajectory optimization, cycle and yield validation.
PLC handshaking, MES/SCADA reporting, AGV coordination.
Risk assessment, safety circuits, e-stop and guarding.
One method, many floor cases. Directions only; config follows a site survey.
A robot does calisthenics on cue for PE class demos.
Camera-guided pick and place for mixed parts, results uploaded.
Dual-station turnover loading, interlocked with machine door and chuck.
Heavy payload handling and precision stacking with force control.
Mixed carton palletizing with one-click recipe changeover.
Seam tracking and pose re-planning to cut repeated teaching.
Gun flow coupled with travel speed for consistent film thickness.
Robot or gantry serving CNC machines for unattended night shifts.
Robot mounted on a mobile base for cross-station handling and lifts.
Uncapping, pipetting and instrument loading in one automated flow.
Greeting, guiding and interactive demos with editable content.
Ripeness detection and soft grippers that avoid bruising fruit.
Target: one 45-minute PE class. A six-axis cobot in front of the mat runs eight routines on cue — full run or slow breakdown — called from a teacher tablet, with speed and force capped so students stay close.
Vision locating plus dual-station magazine; changeover from two hours to twenty minutes.
20-min changeover
Vision-guided path with in-line bead width measurement; out-of-tolerance parts diverted.
Full in-line check
Constant-force floating tool with path compensation replacing manual deburring in a dust area.
Constant force
Two cobots split feeding and screwing; cycle rebalanced around the bottleneck.
Cycle rebalanced
Light curtains and speed limiting for shared cells, validated against safety functions.
Safety validated
Mechanics kept, controller replaced and programs rewritten so spares are available again.
Spares restored
If a case is not viable, we say so first, then talk scope and quote.
Safety changes come with a risk assessment for you and the OEM to sign off.
Commented programs, parameter lists, source files and backups stay with you.
POC first, then line rollout; 10%–15% final payment tied to on-site acceptance.
Workpiece drawing, cycle requirement and current equipment model are enough.
Leave your process and contact — an engineer replies during working hours. For anything urgent, call us.
No messages yet
Delivered. An engineer will reply during working hours.