Feasibility read within 2 working hours — if it will not work, we say so

Leave your contact

Six stages

  1. 01

    Scope 3–5 days

    Deliverable: scope note plus draft acceptance metrics.

  2. 02

    Survey 1–2 days

    Deliverable: process record, cycle baseline, interface and safety status.

  3. 03

    Design 5–10 days

    Deliverable: platform selection, retrofit scope, schedule and cost basis.

  4. 04

    Prototype 1–4 weeks

    Deliverable: measured prototype report; boards and parts iterate weekly.

  5. 05

    Deploy & integrate

    Deliverable: 80% pre-debugged in-house, then on-site with safety and data links.

  6. 06

    Accept & support

    Deliverable: acceptance record, operator training, spare list, warranty terms.

What each stage hands over

Not "we will tell you when it is done" — every stage hands over something to check, and nothing moves on until it passes.

  • 01

    Cycle baseline

    Current manual or legacy cycle measured on survey day and written into the plan as the reference.

  • 02

    Interface list

    Controller, bus, IO and safety circuits itemised; whatever is missing gets fixed first.

  • 03

    Measured prototype

    Prototype report gives cycle, accuracy and defect rate — never "works well".

  • 04

    Quoted changes

    Scope changes get impact and cost in writing before work restarts.

  • 05

    Same-basis acceptance

    Acceptance uses the same measurement method as the survey, so the basis cannot drift.

  • 06

    Rollback ready

    Original programs and wiring records kept, so the line can return to its pre-retrofit state.

Our tempo vs the usual tempo

StageHow we run it
Board revisionsWeekly loops; local fab same-day pickup
PartsCommon parts collected nearby the same day
Downtime80% pre-debugged in-house; window in days
ReportingWeekly board of done items and blockers
OverseasRemote debug plus on-site at milestones

Tempo cases (anonymised)

Single station in 4 weeks

Metal working (anonymised)

Survey to acceptance in four weeks: one week design, one prototype, one pre-debug, one on site.

4-week acceptance

Weekly prototype loops

US team (anonymised)

Three board revisions each back within seven days, parts collected locally the same day, prototype flown home.

7-day loop

Line vision retrofit in 3 months

Electronics (anon.)

Six stations released in two waves; wave two only started after wave one was accepted, line never stopped.

No line stop

Small-batch OEM pilot

Overseas brand (anon.)

Ten-unit pilot validated process and yield, then ramp-up, with certification running in parallel.

Ten-unit pilot

Schedule questions

How fast can we see something moving?
A single station usually runs 2–4 weeks after survey; line or vision projects go in waves, first wave typically 6–10 weeks. It depends on interface openness and parts availability.
Can we prototype only?
Yes. Validate with a prototype first; sample and fixture costs are quoted separately, never bundled into a line contract.
How long is the line down?
We only enter site after 80% in-house pre-debug; on-site time for one station is usually 3–7 days including integration and ramp support.
What if scope changes mid-way?
A change order: impact, schedule and cost in writing first, then work. We do not build and negotiate later.

Ask for a schedule view

Send the process and target go-live; we reply with stage timing and prerequisites.

Talk to us