Single station in 4 weeks
Survey to acceptance in four weeks: one week design, one prototype, one pre-debug, one on site.
4-week acceptance
Six stages, each with a confirmable deliverable and a time window — no moving targets.
Deliverable: scope note plus draft acceptance metrics.
Deliverable: process record, cycle baseline, interface and safety status.
Deliverable: platform selection, retrofit scope, schedule and cost basis.
Deliverable: measured prototype report; boards and parts iterate weekly.
Deliverable: 80% pre-debugged in-house, then on-site with safety and data links.
Deliverable: acceptance record, operator training, spare list, warranty terms.
Not "we will tell you when it is done" — every stage hands over something to check, and nothing moves on until it passes.
Current manual or legacy cycle measured on survey day and written into the plan as the reference.
Controller, bus, IO and safety circuits itemised; whatever is missing gets fixed first.
Prototype report gives cycle, accuracy and defect rate — never "works well".
Scope changes get impact and cost in writing before work restarts.
Acceptance uses the same measurement method as the survey, so the basis cannot drift.
Original programs and wiring records kept, so the line can return to its pre-retrofit state.
| Stage | How we run it | |
|---|---|---|
| Board revisions | Weekly loops; local fab same-day pickup | |
| Parts | Common parts collected nearby the same day | |
| Downtime | 80% pre-debugged in-house; window in days | |
| Reporting | Weekly board of done items and blockers | |
| Overseas | Remote debug plus on-site at milestones |
Survey to acceptance in four weeks: one week design, one prototype, one pre-debug, one on site.
4-week acceptance
Three board revisions each back within seven days, parts collected locally the same day, prototype flown home.
7-day loop
Six stations released in two waves; wave two only started after wave one was accepted, line never stopped.
No line stop
Ten-unit pilot validated process and yield, then ramp-up, with certification running in parallel.
Ten-unit pilot
Send the process and target go-live; we reply with stage timing and prerequisites.
Leave your process and contact — an engineer replies during working hours. For anything urgent, call us.
No messages yet
Delivered. An engineer will reply during working hours.