News & Insights
Field notes on selection, deployment and cost modeling.
Latest posts
Procuring and Accepting a Robot for a Teaching Lab
Vague specifications, closed interfaces and acceptance that only checks movement are the three classic teaching-lab traps.
OEM Programme: Six Gates from Sample to Volume
A passing sample does not mean volume is ready. Tooling ownership, certification holder and BOM change control cause most of the trouble.
8 Things to Confirm Before a Robot Retrofit
Workpiece, cycle time, accuracy, site power and safety conditions — get these wrong and the scope will be redone.
Lease or Buy: Running the Three-Year Numbers
Put depreciation, maintenance and changeover cost on one sheet and the answer is often not what intuition suggests.
Read by topic, not by date
Articles are filed by service line — pick a line first.
Retrofit
Cycle time, interfaces, safety interlocks.
- Station
- interface
- safety
OEM
Pilot builds, certification, ramp-up lessons.
- Pilot
- certification
- ramp
Sourcing
Audits, price comparison, export compliance.
- Audit
- compliance
- logistics
Parts
Motor, board and structure selection.
- PCB
- motor
- structure
Leasing
Fleet size, airspace approval, execution.
- Formation
- approval
- show
Campus
Teardown classes, labs, teaching.
- Teardown
- lab
- teachers
What we write, and what we do not
We write: mistakes we made, parameters we verified, reusable judgement, and the trade-offs inside projects.
We do not write: unsourced industry numbers, client names or line details, or unverified "disruptive" claims. Third-party data carries its source and basis.
Corrections: if a parameter or conclusion does not match reality, tell us; we verify, revise and note the change.
Discuss an article
Leave your contact — we explain the trade-offs behind it for your process.