Teaching equipment tends to fail in predictable ways: specifications written like a bidding contest, delivery demos that show one motion, and a machine nobody can reprogram three years later.

1. Writing requirements that survive review

Write requirements around the tasks students must complete, not around a model number. Three layers work well:

  • Capability: the course and lab projects the equipment must support (kinematics calibration, vision picking, trajectory planning, PLC integration).
  • Interface: the SDK, protocols, simulator support, developer documentation and sample code that must be open.
  • Service: installation and commissioning, teacher training hours, curriculum resources, warranty term and response time, spare-parts availability period.

Avoid exclusionary wording such as "must be brand X model Y". It is procurement-problematic and locks maintenance to one supplier. Where equivalence matters, specify parameter ranges plus "or equivalent".

2. Acceptance that means something

Acceptance is not watching the machine move; it is verifying every committed item.

ItemHow to verify
RepeatabilityMeasure on site under agreed conditions; record method and ambient temperature
SDK and interfacesRun one custom motion with the supplied sample code during acceptance; "docs to follow" is not acceptable
Safety functionsTrigger emergency stop, limits, protective stop and collaborative force limits one by one
Teaching materialsLab guides, slides and sample projects complete and matching the delivered hardware version
Teacher trainingAgreed hours completed; teachers can independently perform one retrofit, with records kept
DocumentationElectrical drawings, protocol documentation, maintenance manual, spare parts list

3. Three things usually missed

Interface openness. Some systems expose only the teach pendant, not low-level control, so students press buttons instead of writing algorithms. Require a live demonstration of code-driven control before purchase.

Consumables and accessories. Grippers, vacuum cups, workpieces and vision lighting are consumables or wear parts. If they are not in the quote, purchasing requests will repeat every term.

Safety practice. Teaching labs have many people and inexperienced operators. Operating rules, fencing or light curtains, and safety training with assessment records belong in the contract as a service item, not as an afterthought.

4. The two years after acceptance

Three things during warranty decide year three: run every lab project once and archive video, keep an equipment log with fault records, and agree a software version upgrade policy with the supplier.